Upcoming Changes to Openreach Business Installations – June 2025
If you’re a business planning a new broadband service or switch, Openreach is updating how installations are handled for services like SOGEA and FTTP. These changes come into effect on 1 June 2025.
What’s Changing?
- Properties will now be assigned a minimum installation level: Standard, Premium, or Advanced.
- Standard installation will no longer be available for business premises, and the minimum installation type will become Premium.
- The logic for this is decided by the Openreach database which uses site information from the National Ordnance Survey.
- You’ll be charged based on the final level of installation irrespective of what was initially requested.
Installation Types Explained
- Standard – Basic install – suitable for most residential homes
- Premium – Additional setup – usually for business sites
- Advanced – Complex installations – e.g. for hospitals, prisons, universities
What If the Wrong Type is Ordered?
- If it’s one level too low, it will be auto-upgraded and you’ll be notified.
- If it’s more than one level too low, the order will be paused, and you’ll be asked to confirm or correct it within 15 days.
How to Check?
We can check your property’s classification for you and make sure the correct engineer visit is booked from the start and if needed, we’ll help request a correction.
Need help? Contact our team today and we’ll guide you through the new process and make sure your installation is ordered correctly.